- Ensure that all temporary seals and covers for intentional openings such as at louvers, exhaust/intake vents, fireplaces, and rooftop units are properly sealed and not damaged or loosened during the construction.
 - Ensure that all plumbing-traps are filled with water.
 - Ensure that all operable windows, trickle-vents, and doors are properly shut and locked.
 - Ensure that all mechanical systems are shut-off and any mechanical dampers set to the closed position.
 
Diagnostic Evaluation
5. Identify locations with air leakage using infrared thermography or smoke pens in accordance with ASTM E1186-17, while the building is maintained at a minimum 25 Pa pressure (during pressurization) or –25 Pa (during depressurization). The following locations shall be evaluated:
- The perimeter of windows and doors.
 - Around operable window hardware and door hardware
 - Penetrations through the roof, wall, and floor assemblies along the plane of the intended air-barrier.
 - Electrical outlets located on exterior-facing walls.
 - Lighting and other electrical penetrations through the roof level ceiling.
 - Above- and below-grade vestibules.
 - Stairs leading to unconditioned space.
 
        