Get Forms

2019 Residential Energy Code Forms

Official California Energy Commission compliance documents you can download and use to show compliance with the 2019 California Building Energy Efficiency Standards (Title 24, Part 6 or Energy Code).

CF1R Forms (Residential Certificates of Compliance)

If your project scope includes HERS measures, CF1R documents will need to be completed through a HERS Provider’s registry. See the California Energy Commission website for more information on HERS and the HERS program.

CF1R documents are to demonstrate the project design and equipment are compliant with the Energy Code at time of permit application. You can use the Forms Ace tool to determine if your project requires HERS verification.

Questions? Contact Us.

  • 2019-CF1R-ADD-01-E: Additions Prescriptive Additions Less Than 1,000 ft2
  • 2019-CF1R-ADD-02-E : Prescriptive Additions - Simple Non-HERS
    (Last modified )
  • 2019-CF1R-ALT-01-E: Alterations Prescriptive Alterations
  • 2019-CF1R-ALT-02-E: Alterations Prescriptive Alterations HVAC
  • 2019-CF1R-ALT-05-E : Prescriptive Alterations - Simple Non-HERS
    (Last modified )
  • 2019-CF1R-ENV-02-E : Area Weighted Average Worksheet
    (Last modified )
  • 2019-CF1R-ENV-03-E : SHGC Worksheet
    (Last modified )
  • 2019-CF1R-ENV-04-E : Cool Roof and SRI Worksheet
    (Last modified )
  • 2019-CF1R-ENV-05-E: Envelope Alternative Default Fenestration Procedure (NA6) Worksheet
  • 2019-CF1R-ENV-06-E: Envelope Interior and Exterior Insulation Layers Worksheet
  • 2019-CF1R-NCB-01-E: Newly Constructed Buildings Prescriptive Newly Constructed Buildings and Additions Equal to our Greater than 1,000 ft2
  • 2019-CF1R-PLB-01-E : Hydronic Heating System Worksheet
    (Last modified )
  • 2019-CF1R-PRF-01-E: Performance Residential Performance Compliance Method
  • 2019-CF1R-STH-01-E-OG100 : Solar Water Heating Systems Worksheet
    (Last modified )
CF2R Forms (Residential Certificates of Installation)

The Residential Certificates of Installation (CF2R) are to demonstrate installations are compliant with the Energy Code at the time of construction and should be submitted by the installer to the inspector. You can use the Forms Ace tool to determine if your project requires HERS verification.

Questions? Contact Us.

  • 2019-CF2R-ADD-02-E : Prescriptive Additions - Simple Non-HERS
    (Last modified )
  • 2019-CF2R-ALT-05-E : Prescriptive Alterations Simple Non-HERS
    (Last modified )
  • 2019-CF2R-ENV-01-E : Fenestration Installation
    (Last modified )
  • 2019-CF2R-ENV-03-E : Insulation Installation
    (Last modified )
  • 2019-CF2R-ENV-04-E : Roofing Radiant Barrier
    (Last modified )
  • 2019-CF2R-ENV-20-H: Envelope-HERS Building Leakage Diagnostic Test
  • 2019-CF2R-ENV-21-H: Envelope-HERS QII - Framing Stage
  • 2019-CF2R-ENV-22-H: Envelope-HERS QII – Insulation Installation Stage
  • 2019-CF2R-LTG-01-E : Lighting Single Family Dwellings
    (Last modified )
  • 2019-CF2R-LTG-02-E : Lighting Multi Family Dwellings
    (Last modified )
  • 2019-CF2R-MCH-01-E: Mechanical-NonHERS Space Conditioning Systems
  • 2019-CF2R-MCH-02-E: Whole House Fan
    (Last modified )
  • 2019-CF2R-MCH-04-E: Mechanical-NonHERS Evaporative Coolers
  • 2019-CF2R-MCH-20-H: Mechanical-HERS Duct Leakage Diagnostic Test
  • 2019-CF2R-MCH-21-H: Mechanical-HERS Duct Location Verification
  • 2019-CF2R-MCH-22-H Mechanical-HERS Fan Efficacy
  • 2019-CF2R-MCH-23-H: Mechanical-HERS Airflow Rate
  • 2019-CF2R-MCH-24-H: Envelope-HERS Building Envelope Air Leakage Worksheet
  • 2019-CF2R-MCH-25-H: Mechanical-HERS Refrigerant Charge Verification
  • 2019-CF2R-MCH-26-H: Mechanical-HERS Rated Space Conditioning System Equipment Verification
  • 2019-CF2R-MCH-27-H: Mechanical-HERS Indoor Air Quality and Mechanical Ventilation
  • 2019-CF2R-MCH-28-H: Mechanical-HERS Return Duct Design and Air Filter Grille Device Sizing According to Tables 150.0-B or C
  • 2019-CF2R-MCH-29-H: Mechanical-HERS Duct Surface Area Reduction; R-Value; Buried Ducts Compliance Credit
  • 2019-CF2R-MCH-30-E: Mechanical-HERS Ventilation cooling compliance credit
  • 2019-CF2R-MCH-31-H Mechanical-HERS HERS Verified Whole House Fan
  • 2019-CF2R-MCH-32-H: Mechanical-HERS Kitchen Ventilation
  • 2019-CF2R-PLB-01-E: Plumbing-DHW-NonHERS Multifamily Central Hot Water System Distribution
  • 2019-CF2R-PLB-02-E: Plumbing (DHW)-NonHERS Single Dwelling Unit Hot Water System Distribution
  • 2019-CF2R-PLB-03-E: NonHERS Pool and Spa Heating Systems
    (Last modified )
  • 2019-CF2R-PLB-21-H: Plumbing (DHW)-HERS HERS Verified Multifamily Central Hot Water System Distribution
  • 2019-CF2R-PLB-22-H Plumbing (DHW)-HERS HERS Verified Single Dwelling Unit Hot Water System Distribution
  • 2019-CF2R-PVB-01-E Photovoltaics-NonHERS Photovoltaic Systems
  • 2019-CF2R-PVB-02-E Photovoltaics-NonHERS Battery Storage Systems
  • 2019-CF2R-SRA-01-E Solar Ready Solar Ready Areas
  • 2019-CF2R-SRA-02-E Solar Ready Minimum Solar Zone Area Worksheet
  • 2019-CF2R-STH-01-E: Solar Water Heating Systems
    (Last modified )
CF3R Forms (Residential Certificates of Verification)

CF3R documents are to demonstrate field verification and/or diagnostic testing is compliant with the Energy Code at the time of construction and should be submitted by the HERS rater to the inspector.
If your project scope includes HERS measures, CF3R documents will need to be completed through a HERS Provider’s registry. See the California Energy Commission website for more information on HERS and the HERS program.

You can use the Forms Ace tool to determine if your project requires HERS verification.

Questions? Contact Us.

  • 2019-CF3R-ENV-20-H: Envelope-HERS Building Leakage Diagnostic Test
  • 2019-CF3R-ENV-21-H: Envelope-HERS QII - Framing Stage
  • 2019-CF3R-ENV-22-H: Envelope-HERS QII – Insulation Installation Stage
  • 2019-CF3R-EXC-20-H: Existing Conditions HERS Verification of Existing Conditions for Residential Alterations
  • 2019-CF3R-MCH-20-H: Mechanical-HERS Duct Leakage Diagnostic Test
  • 2019-CF3R-MCH-21-H: Mechanical-HERS Duct Location Verification
  • 2019-CF3R-MCH-22-H: Mechanical-HERS Fan Efficacy
  • 2019-CF3R-MCH-23-H: Mechanical-HERS Airflow Rate
  • 2019-CF3R-MCH-24-H: Envelope-HERS Building Envelope Air Leakage Worksheet
  • 2019-CF3R-MCH-25-H: Mechanical-HERS Refrigerant Charge Verification
  • 2019-CF3R-MCH-26-H: Mechanical-HERS Rated Space Conditioning System Equipment Verification
  • 2019-CF3R-MCH-27-H: Mechanical-HERS Indoor Air Quality and Mechanical Ventilation
  • 2019-CF3R-MCH-28-H: Mechanical-HERS Return Duct Design and Air Filter Device Sizing According to Tables 150.0-B or C
  • 2019-CF3R-MCH-29-H: Mechanical-HERS Duct Surface Area Reduction; R-value; Buried Ducts Compliance Credit
  • 2019-CF3R-MCH-31-H: Mechanical-HERS HERS Verified Whole House Fan
  • 2019-CF3R-MCH-32-H: Mechanical-HERS Kitchen Ventilation
  • 2019-CF3R-PLB-21-H: Plumbing (DHW)-HERS HERS Verified Multifamily Central Hot Water System Distribution
  • 2019-CF3R-PLB-22-H: Plumbing (DHW)-HERS HERS Verified High Rise Residential/Hotel/Motel Single Dwelling Unit Hot Water System Distribution

Helpful Resources

Need a hand with the forms? Check out the Forms Ace™ to figure out which forms are required for your project.

Resources
Forms Ace™
The Forms Ace™ tool helps you figure out which Title 24, Part 6 forms apply to your specific project. Use this tool before your permit submittal to determine which forms will be required for your Addition, Alteration or New Construction project — and whether or not your project requires HERS (Home Energy Rating System) verification.
Get Other Forms
2025 forms are used for projects permitted after January 1, 2026. For all projects permitted under the 2022 or 2019 Energy Codes, see the Forms Page.

2019 Energy Code Forms

Still have questions? Contact Us.